Search results for "Chen Liangbin , a business strategy consultant assisting with long-term planning."
571 results found
Four strategic pillars
Details about the four strategic pillars - understand, prevent, respond and assure.
Sterilization (SHTM 2010 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 2010 Parts 1 to 6: ensure that sterilizers are operated in compliance with legislation/standards.
Electrical safety guidance for high voltage systems (SHTM 2021 and SHTM 06-03 ARCHIVED)
(Archived) Operational guidance on electrical safety requirements for high voltage systems in healthcare premises.
Electrical safety guidance for high voltage systems (SHTM 06-03)
This Scottish Health Technical Memorandum gives operational guidance on electrical safety requirements for high voltage systems in healthcare premises
Literature review and recommendations to inform a minimising ventilator associated pneumonia (VAP) quality improvement tool
Key infection prevention and control recommendations
Report on Overheating and DSM modelling
NHS Scotland new build health buildings overheating and Dynamic Simulation Modelling (DSM).
Emergency Electrical Generators (SHTN 5 ARCHIVED)
(Archived) Scottish Hospital Technical Note 5: Operation and Maintenance of Emergency Electrical Generators
Specialist services - Acoustics (SHTM 2045 and SHTM 08-01 ARCHIVED)
(Archived) This guidance document sets out the acoustic criteria for the design and management of new and temporary healthcare facilities.
In-patient facilities for older people (HBN 37)
In-patient facilities for older people.
Renal care - Satellite dialysis unit (HBN 07-01)
This Health Building Note (HBN) provides guidance on accommodation for maintenance dialysis, based in a satellite unit.