Skip to main content
Guidance

Medical Gas Pipeline Systems (SHTM 02-01)

Published on 12 August 2026

From: NHSScotland Assure

Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.

Documents

Details

The SHTM 02 series covers piped medical gases, medical and surgical air, and medical vacuum installations. It applies to all medical gas pipeline systems installed in healthcare premises and anaesthetic gas scavenging disposal systems.

  • Part A: design, installation, validation and verification.
  • Part B: operational management.

This is an updated version of this Guidance document, please click here to see the archived version.

This file may not be suitable for users of assistive technology. If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email nss.feedback@nhs.scot. We will do our best to assist where possible and practicable. It would be helpful if you tell us what format you need and advise on any assistive technologies you are using.