Search results for "BCCMINING.COM%ud83d%udcafComputing power automated operation and maintenance"
215 results found
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Safety Information Message – SIM2110
SIM2110 - HSE Safety Notice on lubrication of circuit breakers: risk of catastrophic failure / fire
Pneumatic Tube Transport Systems (SHTM 2009 and SHTM 08-04 ARCHIVED)
(Archived) SHTM 2009 and SHTM 08-04 Parts A and B: overview, management and design considerations for pneumatic tube transport systems.
Specialist services - Bedhead services (SHTM 2015 and SHTM 08-03 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 2015 and 08-03 Specialist services: Bedhead services.
Specialist services - Bedhead services (SHTM 08-03) V1
Scottish Health Technical Memorandum 08-03: Specialist services - Bedhead services.
Pneumatic Tube Transport Systems (SHTM 08-04)
Scottish Health Technical Memorandum 08-04 Parts A and B: overview, management and design considerations for pneumatic tube transport systems.
Notes for Boards: Air Sampling within Operating Theatres V1
This document aims to provide best practice and standardised air sampling recommendations for use within Scottish health boards.
Building Management Systems (SHTM 2005 and SHTM 08-05 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.
Safety Action Notice - SAN(SC)19/02
SAN(SC)19/02 - Depleted batteries in intraosseous injectors
Building Management Systems (SHTM 08-05)
Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.