This document gives best practice advice and provides a generic overview for Health Facilities Scotland’s suite of Scottish Health Technical Memoranda
(Archived) Gives best practice advice and provides a generic overview for Health Facilities Scotland’s suite of Scottish Health Technical Memoranda.
(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.
Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.
(Archived) Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.
Scottish Health Technical Note 02-00 interprets and provides guidance on CEL 2 (2012) and with GCCAM provides a framework for delivery of the policy.
Decontamination Logbooks to be used in conjunction with relevant SHTM Guidance Publication.
Ref: EFA/2011/004 (UPDATE)
High-Voltage (HV) 11KV Switchgear – Schneider Electric (Merlin Gerin) Ringmaster RN2c, RE2c and RN6c ring main units.
Scottish Health Technical Memorandum 08-04 Parts A and B: overview, management and design considerations for pneumatic tube transport systems.
(Archived) Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises.