Search results for "[Rich Miner]%ud83d%udd25richminer.com%ud83c%udfe7overclock settings for ETH"
232 results found
NHS National Services Scotland Mainstream Equality Report
NSS Mainstream Equality Report in line with the requirements set out in the Equality Act 2010
AssureResearch23-0001 The role of air pressure transients on the spread of bacteria from water trap seals in clinical settings: A laboratory based pilot study
The role of air pressure transients on the spread of bacteria from water trap seals in clinical settings: A laboratory based pilot study. Final Report
Existing and emerging technologies used for the decontamination of the healthcare environment: Steam: Literature review and practice recommendations Version 3.0
This literature review examines the available professional literature on the use of Steam Decontamination Systems in the healthcare setting.
NHS National Services Scotland Equality Outcome Progress Report
NSS Equality Outcome Progress Report in line with the requirements set out in the Equality Act 2010
Guidance and publications
Find CARHAI Guidance and information
Endoscope Decontamination Document System (EDDS) (PRO-179 series)
Documentation system covering decontamination policy document and procedures covering the management of flexible endoscope decontamination lifecycle
Quality Improvement Tool (QIT) Literature Review - PVC Insertion and Maintenance of Peripheral Venous Catheters (PVC)
Examines the available professional literature on the Insertion and Maintenance of Peripheral Venous Catheters (PVC) in the health and care setting
NHSScotland Guidance for Decontamination of Semi-Critical Ultrasound Probes; Semi-invasive and Non-invasive Ultrasound Probes
Sets out the operational procedures for decontamination of Semi-critical probes using High Level Disinfection (HLD).
Information Message - IM/2021/001
IM/2021/001 - Supply disruption of sterile infusion sets and connectors manufactured by Becton Dickinson (BD)
Confined spaces policies procedures and guidance (SHTM 08-07)
The procedures set out in this guidance are intended to allow Authorising Engineers to fulfil the requirement of Regulation 4(2).