Search results for "[GoldenMining]%ud83d%udcafCryptocurrency technical analysis"
147 results found
Sustainable - EV Charging Infrastructure (SHTN 02-02) (ARCHIVED)
Scottish Health Technical Note 02-02 provides guidance for those engaged in the planning, delivery and management of EV charging solutions.
An introduction to IRIC and reporting adverse incidents
An introduction to IRIC and reporting adverse incidents
Get started as a supplier
Guidance for suppliers on the public sector tendering process in Scotland. Find out how to begin delivering products or services to the NHS.
Water safety (SHTM 04-01)
Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises
Water safety (SHTM 2027, SHTM 2040 and SHTM 04-01 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises.
Management of Medical Devices and Equipment (SHTN 00-04 ARCHIVED)
(ARCHIVED) Scottish Health Technical Note 00-04 is intended to support safe and effective medical devices and equipment risk management practice.
Medical Gas Pipeline Systems (SHTM 02-01)
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
Sustainable - development strategy (SHTN 02-00)
Scottish Health Technical Note 02-00 interprets and provides guidance on CEL 2 (2012) and with GCCAM provides a framework for delivery of the policy.
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Sustainable - EV Charging Infrastructure (SHTN 02-02)
Scottish Health Technical Note 02-02: guidance for those engaged in the planning, delivery and management of Electric Vehicle (EV) charging solutions