Search results for "Gi%u00e0y b%u00f3ng r%u1ed5-%uff08H87.CC%uff09-Gi%u00e0y b%u00f3ng r%u1ed5->>h87.cc<<-tb8s3.html"
424 results found
Building Management Systems (SHTM 2005 and SHTM 08-05 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 08-05 Parts A, B, C and D: BMS responsibilities, design and operation.
Medical Gas Pipeline Systems (SHTM 02-01)
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
GP17 forms and patient signatures
advice on using the GP17 forms and recording patient signatures
Water safety (SHTM 04-01)
Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises
Management of reusable surgical instruments during transportation, storage and after clinical use (GUID 5010)
GUID 5010 Parts A and B: awareness of the fragile nature of the sterile packs/trays and the used instruments/packs/trays and need to handle with care.
Join us at the NHS Scotland Event 2022
The biggest health and social care conference in Scotland returns to an in-person format in Aberdeen.
Water safety (SHTM 2027, SHTM 2040 and SHTM 04-01 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises.
Decontamination of medical devices in a Central Decontamination Unit (SHTM 01-01)
Scottish Health Technical Memorandum 01-01 Parts A, B, C, D, E and F, GUID 5017 and 5019: decontamination of medical devices processed through a CDU.
NSS Workforce Plan
NSS Workforce Plan from April 2022 to March 2025 including appendices A: Great Place to Work Plan, B: NSS 5 Pillars Action Plan and C: NHS Circulars.
NMRU services
The confirmatory and screening services for blood borne infections provided by Scotland's National Microbiology Reference Unit (NMRU).