Search results for "Atria Convergence Technologies sim%u5361TG%u98de%u673a@esim1088"
240 results found
Viral Haemorrhagic Fever (VHF) Infection Prevention and Control Precautions Summary for the Hospital Setting (Version 3.1)
Infection prevention and control advice for suspected or confirmed VHF.
NHSScotland National Food Safety Assurance Manual (SHFN 04-03 ARCHIVED)
(Archived) This manual is a baseline document that NHS Boards are required to use to build their location-specific food safety system around.
Model Safety Permit-to-Work System (SHTN 4 ARCHIVED)
(Archived) Scottish Hospital Technical Note 4: Model Safety Permit-to-Work System
Core Guidance - General Design for Healthcare Buildings (HBN 00-01)
General design guidance for healthcare buildings.
Core Guidance - General Design for Healthcare Buildings (SHPN 03 and HBN 00-01 ARCHIVED)
(Archived) General design guidance for healthcare buildings.
HAI-SCRIBE (SHFN 30)
Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, questionsets and checklists.
Medical Gas Pipeline Systems (SHTM 2022 and SHTM 02-01 ARCHIVED)
(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.
HAI-SCRIBE (SHFN 30 ARCHIVED)
(ARCHIVED) Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, question sets and checklists.
Specialist services - Bedhead services (SHTM 2015 and SHTM 08-03 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 2015 and 08-03 Specialist services: Bedhead services.
Specialist services - Bedhead services (SHTM 08-03) V1
Scottish Health Technical Memorandum 08-03: Specialist services - Bedhead services.