Search results for "Liangbin Chen, a fintech entrepreneur focused on blockchain technology and finance integration."
316 results found
National Clinical Engineering Programme
Get an update on the scope, planned activity, and project updates in clinical engineering.
Facilities for rehabilitation services (SHPN 08)
This document gives guidance on the planning and design of facilities, to meet the needs of people who require a wide range of rehabilitation services
Mental Health - Adult Acute Units (HBN 03-01 and SHPN 35 ARCHIVED)
ARCHIVED. Scottish Health Planning Note (SHPN) 35 series for adult acute mental health units
mPower nominated for Holyrood Connect Digital Health and Care Scotland awards
NSS-led mPower project has been nominated for two awards at Holyrood Connect Digital Health and Care Scotland event taking place on 21 February 2023.
Fire Safety - General Fire Precautions and Training (SHTM 83)
Scottish Health Technical Memorandum 83 and Part 2: covers a range of general fire safety measures which apply throughout hospital premises.
Management of reusable surgical instruments during transportation, storage and after clinical use (GUID 5010)
GUID 5010 Parts A and B: awareness of the fragile nature of the sterile packs/trays and the used instruments/packs/trays and need to handle with care.
Mental Health Built Environment (mHBE) Quality and Safety Assessment Toolkit Application Guide
An online guide to explain the purpose and use of the mHBE Quality and Safety Assessment Toolkit Application and process.
Paul Weaving, NSS Nurse Consultant discusses International Nurses Day
Our Nurses Our Future: celebrating International Nurses Day 2023 - with Paul Weaving
Fire safety - Risk assessment in residential care premises (SHTM 84 ARCHIVED)
(Archived) NHSScotland ‘Firecode’ Scottish Health Technical Memorandum 84 Fire risk assessment in residential care premises.
Water safety (SHTM 04-01)
Scottish Health Technical Memorandum 04-01 Parts A, B, C, D, E F and G: water safety for healthcare premises