Search results for "Serie A-%uff0812399.CC%uff09-Serie A->>12399.cc<<-ue0p.html"
63 results found
Electrical services supply and distribution (SHTM 06-01)
Scottish Health Technical Memorandum 06-01 Parts A and B: Electrical services supply and distribution design considerations and operational management
Mains signalling (SHTM 2035)
Scottish Health Technical Memorandum 2035 Parts 1, 2 and 3: for mains signalling on the low-voltage installations associated with a single site
Sterilization (SHTM 2010)
Scottish Health Technical Memorandum 2010 Parts 1, 2, 3, 4, 5 and 6: ensure that sterilizers are operated in compliance with legislation/standards
HAI-SCRIBE (SHFN 30)
Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, questionsets and checklists.
Medical Gas Pipeline Systems (SHTM 2022 and SHTM 02-01 ARCHIVED)
(Archived) SHTM 02-01 Parts A and B: Medical gas pipeline systems design, installation, validation, verification and operation.
HAI-SCRIBE (SHFN 30 ARCHIVED)
(ARCHIVED) Scottish Health Facilities Note 30 Parts A, B and C: HAI-SCRIBE manual, implementation, assessment, question sets and checklists.
Fire Safety Precautions and Engineering (SFPN 00-02 and SHTM 81 ARCHIVED)
(Archived) Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Medical Gas Pipeline Systems (SHTM 02-01)
Scottish Health Technical Memorandum 02-01 Parts A and B: medical gas pipeline systems design, installation, validation, verification and operation.
Fire Safety Precautions and Engineering (SHTM 81)
Scottish Health Technical Memorandum 81 Parts 1, 2 and 3: Fire precautions for new premises, fire engineering and atria guidance.
Decontamination - Washer-disinfectors (SHTM 2030 ARCHIVED)
(Arch.) Scottish Health Technical Memorandum 2030 Parts 1 to 3: guidance for WDs for processing medical devices, laboratory ware and sanitary product.